On November 15, the First Plenary Session of the 18th CPC Central Committee was convened. The two-week “18th†power protection work successfully concluded. During the “18th National Congress of the People's Republic of Chinaâ€, the Ningxia Power Grid operated stably with a maximum load of 9.97 million kilowatts and a total of 30.9 million kwh of new energy.
"The 18th National Congress" was held on the occasion of the Ningxia company's construction of the "Three Sets and Five Majors" that had just passed the acceptance by the State Grid Corporation of China. The "eighteenth National Congress" held a comprehensive test of the company's new system, new mechanism, and new procedures. . The Ningxia Company's large-scale operation system gave full play to its institutional advantages. Through more efficient and centralized management, the dispatchers at all levels adhered to their positions, rigorous and meticulous, fulfilled their duties and fulfilled the tasks of the 18 major power-saving units.
During the “18th National Congress†period, the Ningxia Power Grid coincided with the beginning of the winter load peak and was also the beginning of the Ningxia Gale Wind Season. Ningxia’s measures to ensure the safety of the power grid and strengthen the checking of the power grid operation mode were carried out through the dispatcher’s on-line calculation and off-line staff calculations. The combined approach eliminates grid operation risks and proposes pre-control measures. At the same time, personnel from both districts and districts comprehensively combinated the operational risks of single busbar, single-supply, single-substation transformer substations, implemented load transfer measures and accident plans; Zero-risk operation of the power grid. During the power protection period, Ningxia strengthened cooperation between the two districts in the district and successfully completed the operation of Tao Le No. 3 Main Transformer, Zaokai Line II and Zhongkai Line II, and completed the Luoshan Variable Stability Control System, which was upgraded. Mountain area Power Supply capacity of 200 MW. All units of the company's system carried out self-inspection and mutual inspection of relay protection, and strengthened the first line of defense for power grid operation. In the windy weather, the main network line of Ningxia Power Grid tripped dozens of times, and the protective devices were all in correct operation and had withstood the test. At the same time, Ningxia carried out safety inspections and rectifications on the automation equipment of 220 kV and above plant stations in the network to ensure the normal operation of the automation system and provide more accurate and timely technical support for the operation of the power grid.
"The 18th National Congress" was held on the occasion of the Ningxia company's construction of the "Three Sets and Five Majors" that had just passed the acceptance by the State Grid Corporation of China. The "eighteenth National Congress" held a comprehensive test of the company's new system, new mechanism, and new procedures. . The Ningxia Company's large-scale operation system gave full play to its institutional advantages. Through more efficient and centralized management, the dispatchers at all levels adhered to their positions, rigorous and meticulous, fulfilled their duties and fulfilled the tasks of the 18 major power-saving units.
During the “18th National Congress†period, the Ningxia Power Grid coincided with the beginning of the winter load peak and was also the beginning of the Ningxia Gale Wind Season. Ningxia’s measures to ensure the safety of the power grid and strengthen the checking of the power grid operation mode were carried out through the dispatcher’s on-line calculation and off-line staff calculations. The combined approach eliminates grid operation risks and proposes pre-control measures. At the same time, personnel from both districts and districts comprehensively combinated the operational risks of single busbar, single-supply, single-substation transformer substations, implemented load transfer measures and accident plans; Zero-risk operation of the power grid. During the power protection period, Ningxia strengthened cooperation between the two districts in the district and successfully completed the operation of Tao Le No. 3 Main Transformer, Zaokai Line II and Zhongkai Line II, and completed the Luoshan Variable Stability Control System, which was upgraded. Mountain area Power Supply capacity of 200 MW. All units of the company's system carried out self-inspection and mutual inspection of relay protection, and strengthened the first line of defense for power grid operation. In the windy weather, the main network line of Ningxia Power Grid tripped dozens of times, and the protective devices were all in correct operation and had withstood the test. At the same time, Ningxia carried out safety inspections and rectifications on the automation equipment of 220 kV and above plant stations in the network to ensure the normal operation of the automation system and provide more accurate and timely technical support for the operation of the power grid.
5V Power Supply, it has multi plug were suitable for many countries. We can meet your specific requirement of the products, like label design. The plug type is US/UK/AU/EU. The material of this product is PC+ABS. All condition of our product is 100% brand new.
Our products built with input/output overvoltage protection, input/output overcurrent protection, over temperature protection, over power protection and short circuit protection. You can send more details of this product, so that we can offer best service to you!
5V Power Supply
5V Power Supply,5V Pc Power Supply,5V Dc Power Supply ,5V Power Supply For Computer
Shenzhen Waweis Technology Co., Ltd. , https://www.waweis.com