On the construction of the Nanba Ma Road in Shenyang, the underground cable TV cable is being dug by the staff during construction, resulting in a large area of ​​downtime. Tens of thousands of residents do not see TV.
Yesterday, the reporter received a phone call from a reader and said that in the Nanba Road area where his family lived, cable TV cable was cut off due to construction and road construction, causing a large area of ​​cable television to stop broadcasting. "I discovered at 11pm that there wasn't a TV station open. There was no signal in the morning to see it again." said Ma Liang, a resident of Nanba Road. "Yeah, I don't want to see the news. I haven't watched TV this weekend. It's really boring." Liu Wei said helplessly. “Blindly digging brings much trouble to the residents.†One resident pointed to the roadbed dug by the construction. Located on the side of the roadbed, many of the pipelines in the open trenches of the construction are exposed on the outside, and the pipelines that run horizontally and horizontally make it difficult to distinguish their roles.
Afterwards, the reporter learned from Shenyang Media Network Co., Ltd. that around 10:30 pm on August 26th, the cable television signals caused by road construction were interrupted. The areas that were interrupted were: Kunming South Street, Xinghua Street, Sanya Street, and Nanjing. South Street, Xi'an Street, Minzu South Street, Heping South Street, South Wuma Road, Nanliu Ma Road, South Qiama Road, Nanba Ma Road, Nanjiuma Road, Taiyuan Street, Haikou Street, Qixian Street, etc. For the damage of this cable cable, people have been sent for inspection and maintenance and resumed as soon as possible.
As of 6pm last night, cable television has not resumed normal transmission.
Yesterday, the reporter received a phone call from a reader and said that in the Nanba Road area where his family lived, cable TV cable was cut off due to construction and road construction, causing a large area of ​​cable television to stop broadcasting. "I discovered at 11pm that there wasn't a TV station open. There was no signal in the morning to see it again." said Ma Liang, a resident of Nanba Road. "Yeah, I don't want to see the news. I haven't watched TV this weekend. It's really boring." Liu Wei said helplessly. “Blindly digging brings much trouble to the residents.†One resident pointed to the roadbed dug by the construction. Located on the side of the roadbed, many of the pipelines in the open trenches of the construction are exposed on the outside, and the pipelines that run horizontally and horizontally make it difficult to distinguish their roles.
Afterwards, the reporter learned from Shenyang Media Network Co., Ltd. that around 10:30 pm on August 26th, the cable television signals caused by road construction were interrupted. The areas that were interrupted were: Kunming South Street, Xinghua Street, Sanya Street, and Nanjing. South Street, Xi'an Street, Minzu South Street, Heping South Street, South Wuma Road, Nanliu Ma Road, South Qiama Road, Nanba Ma Road, Nanjiuma Road, Taiyuan Street, Haikou Street, Qixian Street, etc. For the damage of this cable cable, people have been sent for inspection and maintenance and resumed as soon as possible.
As of 6pm last night, cable television has not resumed normal transmission.
LED Track Light,SMD LED Strip,LED Downlight Co., Ltd. , http://www.cnledstrip.com